NorCal PUG

Menu

  • Home
  • About
    • History
    • Board Members
    • PUG Bylaws
    • Other Documents
  • Events
    • Calendar
    • Workshops & Training
    • Meeting Documents
    • Annual Seminars
    • Field Trips
    • Photos
  • Membership
    • Forms
    • Feedback
    • 2021-2022 Member List/Links
    • Payment
  • Photos
  • Resources

July 2018 Monthly Meeting

Posted on July 8, 2018 by norcalpugweb

Leave a Comment

Join us Tuesday June 10 from 11:00 AM to 1:00 PM

Presentation: HDPE 101 – Peter Dyke, Alliance for PE Pipe

HDPE

June 2018 Monthly Meeting

Posted on May 29, 2018 by norcalpugweb

Leave a Comment

Join us Tuesday June 12 from 11:00 AM to 1:00 PM

Presentation: Polypropylene Resin Technology by ADS Pipe

2018_06_Meeting HDPE

May 2018 Monthly Meeting

Posted on May 29, 2018 by norcalpugweb

Leave a Comment

Presentation: Native Slurry Backfill, Glen Peach, County of Sacramento

Pages from 2018_05_Native Slurry Backfill

April 2018 Monthly Meeting

Posted on April 17, 2018 by norcalpugweb

Leave a Comment

Presentation: Are Micro-porous Pipes Able to Eliminate Environmental Concerns When Installing Intakes? Anthony T. Jones, Ph.D.

2018_04 Presentation Microporous Intake Pipe

March 2018 Monthly Meeting

Posted on April 2, 2018 by norcalpugweb

Leave a Comment

Join us Tuesday March 10th from 11 to 1

Presentation: “Rehabilitating 105-inch Interceptor – Innovations and Lessons Learned” Tim Karlstrand and Gary Warren

2018_03_Presentation Rehab 105-inch Interceptor

« 1 … 11 12 13 14 15 »
Contact PUG
pugnorcal@gmail.com
Upcoming Events
  • "City of Santa Rosa, CA – Sewer Master Plan and Condition Assessment Project" By Glenn Hermanson, Woodard & Curran - Monthly Meeting June 14, 2022 at 11:30 am – 1:00 pm Centre Concord 5298 Clayton Rd, Concord, CA 94521 City of Santa Rosa, CA – Sewer Master Plan and Condition Assessment Project. Inspection, condition assessment, debris measurements via sonar inspection, risk assessment, remaining useful life predications, and project prioritization for 13 miles of reinforced concrete trunk sewer ranging in sizes from 33 - 66” in diameter, including 28sewer siphons.  
  • UV Cured Glass Reinforced Pipeline July 12, 2022 at 11:30 am – 1:00 pm Centre Concord 5298 Clayton Rd, Concord, CA 94521 UV Cured Glass Reinforced Pipeline
  • PCWA Foothill Raw Water Pipeline Phase 2 - Scott Greenwood, West Yost Associates August 9, 2022 at 11:30 am – 1:00 pm Centre Concord, 5298 Clayton Rd, Concord, CA 94521, USA This presentation will cover the planning, design and construction of over 15,000 feet of 12" to 45" pipeline, a railroad crossing, energy dissipation structures and pump station improvements for a project that connects existing pipelines located south of I-80 to the Foothill WTP.
  • Home
  • About
  • Events
  • Membership
  • Photos
  • Resources
NorCal PUG
Contact / Proudly powered by WordPress Theme: Natural.
 

Loading Comments...