Our September monthly meeting will be held at the Brown and Caldwell office in Walnut Creek! The address is 201 N Civic Dr Suite 300, Walnut Creek, CA 94596, and we will begin at 11:00 a.m. on September 10th, 2024. Take the South Lobby elevator to the 3rd floor.
The presentation will be provided by Alena Mikhayolva, Geneva Pipe and Precast, and is titled, “Perfect Pipe: Lined Concrete Pipe” This presentation will provide an overview of the Perfect Pipe system including installation and maintenance. Perfect Pipe is a Reinforced Concrete Pipe (RCP) lined with a High-Density Polyethylene (HDPE) plastic lining that protects concrete from microbial-induced corrosion commonly found in municipal wastewater systems. Perfect Pipe is available in standard diameters ranging from 24” to 60”.
Please RSVP using the Google Form link below by, Friday, September 6th by 5pm. This registration window cutoff is slightly earlier than it has been in the past, and is meant to ensure we are able to order the appropriate quantity of food. Thank you for your understanding.
September Agenda and August Minutes