Our September monthly meeting will be held next week, in-person, at Brown and Caldwell in Walnut Creek! The address is, 201 N Civic Dr Suite 300, Walnut Creek, CA 94596, and we will begin at 11:00 a.m. on Tuesday, Sept 13th, 2022. Take the South Lobby elevator to the 3rd floor.
The presentation will be provided by Jeff Tarantino with Freyer & Laureta and is titled, “Town of Hillsborough Harry Tracy Water Treatment Plant Transmission Main Project”. The presentation will discuss how F&L, with Carollo, must perform a pipeline alternatives analysis considering multiple constraints including existing utilities and a multitude of fault crossings to improve the availability of water infrastructure along the Crystal Springs Watershed Wildland Urban Interface. Preliminary design and CEQA will begin in 2022.
Please RSVP using the Google Form link below by Monday, Sept 12th at noon.